10 Critical Checks Before Commissioning a New Facility
Completing construction does not mean a facility is ready to operate. Even after project handover, opening for daily use before technical systems are verified, maintenance is planned, safety infrastructure is checked and operations teams are ready can cause unexpected failures, disruptions and additional costs.

Commissioning therefore covers not only physical handover but all technical and operational preparations needed for safe, sustainable and uninterrupted operation. Verifying systems, preparing maintenance plans and emergency arrangements, and defining operational processes establish the basis for controlled, efficient operation from day one.
At Servis365, we believe technical infrastructure, operational processes and maintenance plans must be addressed holistically for a facility to be managed safely, efficiently and sustainably from the outset. Successful commissioning shapes not only today’s needs but operational performance across the facility’s entire life cycle.
We have compiled the main checks needed to commission a facility safely and sustainably.
- Project and Handover Documentation
Complete as-built documentation, technical drawings, warranties, user manuals and test reports should be received. These documents are fundamental references for operational processes from maintenance to fault management.
- Mechanical System Performance
It is not enough for HVAC, pump, pressure booster, drainage and ventilation systems simply to operate. Their performance must be verified against design criteria and intended use.

- Electrical Infrastructure and Power Continuity
Main and distribution panels, generators, UPS systems, emergency power lines and grounding infrastructure should be tested and verified to support operational continuity.
- Fire Safety Systems
Fire detection and suppression systems, emergency lighting, directional signs and escape routes should be checked against applicable regulations and made ready for operation.
- Emergency Preparedness
Evacuation plans, emergency teams, assembly points, first aid arrangements and communication chains should be defined and shared with relevant teams before operations begin.

- Occupational Health and Safety
Technical spaces, contractor work areas, access points, slippery floors and other potential risks should be assessed and necessary precautions taken.
- Cleaning and Indoor Environmental Quality
Post-construction cleaning should be completed, and filters, ventilation, temperature, humidity and lighting brought to levels that support occupant comfort. Equipment, chemicals, application standards and maintenance procedures used in cleaning should also be documented to establish operational standards.
- Equipment Inventory
The make, model, serial number, warranty period and maintenance intervals of all critical equipment should be recorded in a digital inventory for sustainable asset management. These records facilitate maintenance and help build technical memory and preserve organizational knowledge.
- Preventive Maintenance Plan
Maintenance plans should be created during commissioning rather than after operations begin. This allows planned maintenance from day one, reduces the risk of unexpected failures and supports systematic maintenance activities.
- Operations and User Handover
The duties and responsibilities of technical, security and cleaning teams and other operational stakeholders should be clarified, and necessary training and handover processes completed.
A Strong Start Is the Foundation of Sustainable Operations
A facility’s long-term performance is often directly related to the quality of its initial preparations. Systematic commissioning checks reduce operational risks, optimize maintenance costs and contribute to safe, efficient and sustainable management.
Servis365 combines technical expertise with construction experience to prepare facilities not only for opening but for long-term success. This integrated approach makes it possible to anticipate risks across the operational life cycle and develop sustainable solutions.
The right steps during commissioning form the foundation for operational success throughout the facility’s life cycle.




